Utah Rwy does a fine job, and waste no time in get a loaded coal train toward the summit. With six units on the head end, and six midtrain, they make short work of the hill. Lead units are 9010-9009-9003-5003-9004-2105, mid-train 9008-9007-9013-NREX 2033-9005-9006 . Video taken 4/21/2001. Thanks for watching. Jackmp294.5™...